Project period
09/2018
03/2019
03/2019
Technologies
PLC: Mitsubishi Melsec: Q03CPU, Q01CPU, Q02CPU, FX3
HMI: computer with CitectSCADA 2018 software
Frequency converters: ABB
Customer: LLC “SP APS” for LLC “SME Nika-Tera”.
Location of the object: Nikolaev, Ukraine.
Development and commissioning of a control system for a port area for storage and transshipment of liquid cargo (vegetable oil) with a total capacity of 65 thousand tons (25 tanks), including 4 pumping stations (16 pumps) and more than 200 valves. For tanks, level control (radar) and temperature control (thermal hangers for 10 levels) are used.