Project period
11/2012
06/2013
06/2013
Technologies
SIMATIC Step7 v5.5, WinCC Flexible 2008, PCschematic Automation, WinCC v6.2, PCS7. PLC S7 317-2DP, operator panel TP277
Customer: Slavutich Brewery, Zaporozhye.
Development of electrical project documentation and software for automation system of refrigeration installation:
- piston compressor units – 4 pcs, screw compressors – 4 pcs;
- evaporative condensers – 2 pcs, water purification system;
- ammonia pumps – 2 pcs;
- glycol pumps – 4 pcs;
- water pumps with frequency control – 6 pcs;
- liquid separators – 1;
- heat exchangers – 2 pcs;